Humber College Data Centre Upgrades
Bird Infrastructure was awarded the contract for the Humber College Data Centre Build-out. This project warranted special consideration to mitigate risk while working on a critical data centre. Bird implemented high-level risk assessment procedures from the outset of the project to ensure the data centre remained usable and secure throughout the project duration.
The upgrade required a 120-ton multi-stack chiller with a loose energy recovery system, fire suppression system, Liebert chilled water computer room A/C units, low voltage track busway, UPS system, MCC, and batteries.
Job Type
Chiller Installation and Facility Upgrades
Owner
Humber College
General Contractor
Bird Infrastructure
Approximate Value
$2.4 Million