Skip to main content
image

Cape Breton Regional Hospital Telethermic Distribution Piping

As the project’s general mechanical contractor, Bird oversaw the installation of 16,000 feet of double-wall buried Perma-Pipe Piping System for the hospital’s new heating and cooling system.

The Cape Breton Regional Hospital is the main referral and trauma centre for residents of Cape Breton Island. Originally constructed in 1995, CBRH required a piping system to feed the new heating and cooling system from the energy building to new hospital facilities and future developments. The project scope included the supply and installation of all labour, materials, and equipment. Bird managed surveying, pressure testing, and commissioning while coordinating subcontractors and site logistics to meet key schedule milestones.

Job Type
Piping System Installation
Owner
Build Nova Scotia
General Contractor
PL Healthcare Partners
Approximate Value
$12.4 Million

Powering Through Winter

Our team worked through challenging winter conditions, collaborating closely with the construction manager to coordinate all routing, trenching, civil, dewatering, de-icing, snow removal, and fencing to meet the project’s scheduled milestones.

Project Details

System Commissioning

This included conducting all water treatment and pressure testing in advance of commissioning.

Earthworks

Before installation, Bird conducted all required layouts and locates for the underground services before ground excavation.

System Integration

Connected the existing hospital, future Cancer Centre, and CSB to a new Central Energy Plant for heating and cooling.

See More Projects